top of page

PRM
BUILDING technology i
Project 1: industrialized building system
This group assignment requires us to work in a to produce a report and a sectional model of a simple apartment design units using IBS Construction system . This purpose of this project is to expose us to the critical and analytical study of the different IBS construction methods and engage us to the IBS scoring assessment.

Project 2: construction solutions
This individual assignment integrates with studio project as it aims to facilitate the technical study of the project. This project thought me that construction of the building needs to go hand in hand with the design and also the importance of materiality .
bottom of page