top of page

BUILDING SERVICES

Project 1: Case Study of Building Services in Public Buildings

Project 1 focuses on the systems used in multi-story buildings involving public use.The building we chose is Taylor's University Block B.

This group project of 6 members comes with individual components where each student has to conduct a study on the systems namely:

i. Mechanical ventilation system

ii. Air-conditioning system

iii. Active fire protection system

iv. Passive fire protection system

v. Mechanical transportation system

 

The component I chose was mechanical ventilation system.Each team member is responsible to collect the required data and cooperatively prepare a comprehensive report and a video.

 

In this assignment, we explored the various types of building services installed and discover how they effectively operate and also learn the basic planning principles of building services in actual situations.

Project 2: Application of Building Services

Project 2 emphasizes on the systems used in domestic sized buildings.We are required to plan the application of systems for the building. Among the systems required are as follows:

i. Cold and hot water supply

ii. Sewerage & sanitary system

iii. Drainage and storm water management system

iv. Electrical supply In this assignment

 

We showed our understanding of the systems by applying them into the building design. Buildings will not be able to function efficiently without a proper system in place. Therefore, it is important to have a good interface between the systems and design.

For submission a clear documentation of the drawings and a catalog of the components used need to be presented. 

Link for the catalog:-

https://drive.google.com/file/d/14-CgIt2aY6--xMXfbLkhyxQAMO7bL4X3/view?usp=sharing

The diagrams:-

© 2023 by Pritika. Proudly created with Wix.com

  • Facebook Basic Black
  • Twitter Basic Black
  • Instagram Basic Black
bottom of page